STOKE GIFFORD BRISTOL DEPOT

Client: VolkerFitzpatric
Value: £1.95m
Location: Stoke Gifford, Bristol
Duration: 32 Weeks

  • We are currently undertaking civils works to provide 300,000 litres of additional fuel storage capacity at Stoke Gifford depot and an automatic sanding system will be installed to provide sanding points along the CET spine.
    The main components of these works are:Construction of reinforced concrete tank slabs to take 3 number 100,000 litre fuel tanks to boost the existing fueling system.
    Provision of reinforced concrete slab to take a new sand silo.
    New plant room and yard slabs and associated duct routes.
    Qmax drainage channel and light columns.
    New footpath provision.
    Installation of a forecourt separator and associated below ground drainage runs and connections to existing drainage system.
    Hydro demolition of existing track slabs to install sand supply pipe crossings from the CET trough to feed 25 number deported arms with sanding nozzles.
    Construction of OTX bases for supply pipe gantry installation.